EcoVigour was engaged by Surrey Wildlife Trust to deliver a programme of biodiversity enhancement works across multiple nature reserves as part of a five-year funded initiative supported by Defra, Coast to Capital, and the National Lottery. The programme presented a diverse and technically demanding set of challenges across three distinct sites, each with its own ecological sensitivities, planning requirements, and operational constraints.
At Bay Pond, Godstone Ponds SSSI, long-term sediment accumulation was degrading the network of ponds and wetlands, threatening the ecological integrity of a nationally designated site. At Spynes Mere, the existing island profile within the quarry lake was unsuitable for nesting Common Terns, with the Trust seeking to increase bird activity and habitat provision for this priority species. At Quarry Hanger Nature Reserve, the absence of a suitable parking area was creating safety and access issues for staff, volunteers, and visitors, while any solution had to avoid introducing unnecessary ecological impact within the reserve setting. Across all three sites, works had to be carefully coordinated around ecological calendars, visitor access, and the Trust’s conservation objectives.
EcoVigour was awarded contracts across all three sites, providing a design-and-build capability that allowed each scheme to be developed and delivered in close collaboration with Surrey Wildlife Trust. At Bay Pond, we developed a full design-and-build scheme to address the sediment issues affecting the SSSI, incorporating two attenuation lagoons, habitat restoration, and improved access via the A24 trunk road. At Spynes Mere, we deployed an amphibious excavator to reprofil the existing island, creating a purpose-built nesting environment for Common Terns with recessed shelves, mudflats, and shingle-covered areas. At Quarry Hanger, we installed a grasscrete parking area using recycled geo-cell materials, delivering a durable, low-impact access solution within a two-week programme to minimise disruption to the reserve.
Throughout all three projects, EcoVigour maintained close stakeholder engagement with Surrey Wildlife Trust, coordinating design consultations, regular progress updates, and work scheduling around visitor hours and ecological sensitivities.